Get started
QuoxCLIQuoxCLIGuidesProof

Five new things you can ask Quox, and the command behind each

Five new Quox guides went live today. Each one is a real question asked in chat, the answer from a machine verified run, and the command that gives you the same facts yourself.

Adam Cowles16 November 20265 min read
Five glowing speech bubbles in blue and violet, each joined by a thin line to a small terminal window below, over near-black

Five new guides went live on quox.ai today. Each one starts with a question you would actually ask, shows the answer Quox gave on a real run on our own install, and ends with a Do it yourself step: the command that prints the same facts in your terminal.

All five carry the Machine verified badge: a machine ran the guide on our install and checked the answer against the CLI, and each page links its test report. With them, the QuoxCLI guides now number 152, of which 119 are Machine verified.

1. What promises are open?

What commitments have I got open right now, counting both the ones I owe people and the ones owed to me? How many is that altogether?

Quox handed the question to Ladon, which read the commitments list and then each open item. It counted two, one on each side: a pricing sheet owed to Priya Shah, due 20 November, and a stock order confirmation Tom Ellery owes back, due 25 November.

It said neither is at risk, flagged that the quotes on both records are not verified, and said the count covers only recorded commitments. Nobody searched mail, calendar or notes for promises that were never logged.

Do it yourself: quox commitments list. The Direction column says which way each promise runs.

See every promise that is open

2. Where am I with that promise?

Where am I with sending Priya the servicing plan pricing sheet? When did I say it would be done?

Quox said the promise is still open, that you logged it yourself on 12 November, and that it is linked to a servicing review that day. The due date is 20 November, recorded as a date you stated. Because it is stored as midnight UTC at the start of the 20th, Quox suggested treating the 19th as the real deadline.

With no mailbox connected, it said plainly that it could not tell whether the sheet had been sent.

Do it yourself: quox commitments show <id>. The created_by_kind and capture_mode rows say who recorded the promise.

We held this guide back until the answer named who created the promise correctly. The record says a person entered it, and the answer now says the same.

Check one promise

3. Is there anything on the plan about that?

Is there anything on our Kestrel Cycles spring launch plan about delivery? Has that work started yet?

Quox searched the roadmap, found one delivery stream and said it has not started. It summed up what the plan says, listed the phases, and flagged two things worth checking: the stream depends on a payments stream that is blocked, and the stream's one-line summary and its plan disagree on the delivery distance.

Do it yourself: quox plan search delivery --roadmap <roadmap-id>. Each row is a stream with its status and where the word matched.

This one was also held, until search stayed inside your own organisation and stopped turning up another organisation's demo roadmaps.

Search a plan for a topic

4. What can we measure our work against?

Which readiness checklists can DoneEngine measure our work against? How many are there, and what are a couple of them called?

Quox read the DoneEngine pack list in one call and said there are five checklists, naming each with its id and version, such as Path to launch with 11 subjects. It was clear about the limit: the list says which checklists exist, not whether any of them has been measured.

Do it yourself: quox done packs.

See which readiness checklists you can measure against

5. What counts as ready?

What does our path-to-launch checklist in DoneEngine actually check before something counts as ready? How many gates are on it, and what are the first few?

Quox read the Path to launch checklist and said it has 10 gates, all inherited from the house definition of done. It named the first five in order, starting with "Has a maturity map". It pointed out that only two gates are checked by a machine; the other eight are attested, meaning a person has to stand behind them.

Do it yourself: quox done checklist launch-spine. The checklist is generated from the pack the engine judges, so it does not drift from what is actually checked.

See what a readiness checklist checks

All five only read

None of these questions changes anything. Where a change would make sense, such as marking a promise done, the answer says Quox can raise an approval card, and nothing changes until a person approves it.

For the wider picture, the Evidence Explorer today lists 244 verified proof cases.

What this does not prove

  • This is Quox checking itself. The runs were made on our own install by our own proof engine, not by an independent auditor.
  • A guide shows one verified run's answer. Ask the same question yourself and the wording of the live answer can differ, and so will the data in your own organisation.
  • The sample data is ours. Names on the pages are changed, and the promises, plan and checklists come from a proof organisation, not a customer.